Close Menu
SoCo Digest

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Visit Colorado Springs and La Junta Tourism Director Win Governor’s Awards for Outstanding Tourism Efforts

    Project Taurus Opponents Launch Moratorium Petition as Broadstone Semiconductor Facility Draws New Appeal

    Accu-Precision Selects Colorado Springs for $68 Million Manufacturing Expansion and 133 New Jobs

    Facebook X (Twitter) Instagram
    Trending
    • Visit Colorado Springs and La Junta Tourism Director Win Governor’s Awards for Outstanding Tourism Efforts
    • Project Taurus Opponents Launch Moratorium Petition as Broadstone Semiconductor Facility Draws New Appeal
    • Accu-Precision Selects Colorado Springs for $68 Million Manufacturing Expansion and 133 New Jobs
    • Business Insider: Springs Utilities ‘Energy Wise’ cost breakdown
    • First Tee Southern Colorado to Break Ground Oct. 2 on New $1.2 Million Youth Development Center at Valley Hi
    • Give! Platform Has Channeled $20 Million to Local Nonprofits Since 2009
    • Arkansas River Drought Is Squeezing Rafting Operators, Farmers and Ranchers Across Southern Colorado
    • Four by Brother Luck and the Penrose Room Named in 2026 Michelin Guide
    Wednesday, October 7 LOGIN
    SoCo Digest
    • Home
    • Colorado Media Group
      • About the Digest & Staff
      • Contact Us
      • NORTH Magazine
      • SoCo Insider
    • Advertise
      • Sponsored Content
      • SoCo Digest Media Kit
      • Broadcasting
        • Fox21
        • Spotify
        • Youtube
        • iHeart Radio
    • Events
      • Best in Business
      • 40 Under 40 Awards
      • SoCo Events Calendar
      • Our Events
    • Subscribe
    • Experts
    • Op-Ed
    • Job Board
    SoCo Digest
    You are at:Home » CSU: New Transmission Line Project Strengthens Colorado Springs’ Electric Reliability

    CSU: New Transmission Line Project Strengthens Colorado Springs’ Electric Reliability

    0
    By Sponsored Content on September 1, 2026 Expert Insight

    Brought to You by Colorado Springs Utilities

    As Colorado Springs Utilities continues its transition to a more diverse energy portfolio, investments in a stronger electric grid will help ensure reliable service for customers today and in the future.

    Transmission structures and lines are among the most visible elements of the city's electric system. They support the transport of electric power from generation sources such as power plants to customer homes and businesses.

    The Kelker to South Plant project involves the construction of an overhead high-voltage transmission line connecting two important substations: the newly expanded Kelker Substation, on the city's southeast side, and the South Plant substation, at the site of the former Martin Drake Power Plant.

    This work complements the ongoing Midway to Kelker transmission line project, which includes upgrades at the Nixon, Fountain, Bradley and Kelker substations. The lines provide reliability and resiliency for the community's electric system by moving electricity from the east and south, where generation sources are, to the city's west and downtown areas.

    The transmission line between the Fountain and Bradley substations is now complete, which includes the restoration of El Paso County Parks' Fountain Valley Regional Trail.

    Combined Project Investment

    $93M

    Kelker to South Plant Completion

    2027

    Rate Period Supported By

    2024-2029

    The route for the transmission lines was carefully selected to minimize impacts on neighborhoods and environmentally sensitive areas while prioritizing undeveloped, industrial, commercial and city-owned properties. Existing transmission corridors were used whenever practical.

    The new transmission poles will be steel monopoles, which are more reliable, fire-resistant and provide an extended lifespan compared to wooden poles. These upgrades also help harden the electric system, making critical infrastructure more resilient to severe weather, wildfire risks and other operational challenges.

    Project construction began this summer on the Kelker to South Plant transmission line and is expected to be completed in 2027. The last mile of the line, near downtown, will be constructed underground.

    The two projects, totaling an estimated $93 million, are important investments in building the community's future and are supported by the customer electric base rates approved for 2024-2029.

    Related Posts

    Dawn Dawson: The Machines Got Smarter. Did the Business?

    Culinova’s Mitchell Roth on Why Premium Quality Is the Winning Strategy for Mid-Sized Food Manufacturers

    Visit Colorado Springs Launches Customized Trip Planning Itineraries on VisitCOS.com

    ⚠️ Calendar not visible? Our events calendar may be blocked by privacy tools. If you don’t see the calendar, please allow third-party content for this page and refresh.
    Stay in touch
    • Facebook
    • YouTube
    • Instagram
    • LinkedIn

    Welcome to the Southern Colorado Business Forum & Digest, a digital publication dedicated to providing insight, amplifying visibility, creating accessibility, fostering connectivity, developing opportunity, and delivering results.

    © 2026 Southern Colorado Business Digest | Hosted by Edison Apps, LLC.
    • Sign In
    • About
    • Directory
    • Partners

    Type above and press Enter to search. Press Esc to cancel.